Zoning and Compliance

Natural Building Alliance

Know what you can build before you design it.

Zoning and compliance are often the first constraints on a building
project. Understand the rules, identify the questions, and avoid
expensive assumptions before moving into design and construction.

Zoning & Compliance

The property comes first.

Before choosing a floor plan, materials, or construction system,
determine what the property allows. Local regulations can affect
building size, location, height, use, access, parking, utilities,
and much more.

01 — ZONING

What can you build?

Identify the property’s zoning district, permitted uses,
dimensional requirements, setbacks, height limits, density,
and other applicable regulations.

02 — SITE

Where can you build it?

Understand setbacks, easements, access, slope, drainage,
environmental constraints, utilities, and other site conditions.

03 — APPROVALS

Who needs to approve it?

Determine which permits, reviews, inspections, variances,
agency approvals, and professional certifications may be required.

The Process

Work through the constraints before they become problems.

01

Identify the jurisdiction

Determine which city, county, township, or other authority
controls the property.

02

Find the zoning designation

Locate the applicable zoning district and the regulations
associated with it.

03

Check site constraints

Look beyond the zoning label at setbacks, overlays, access,
utilities, environmental conditions, and easements.

04

Confirm the approval path

Determine which permits, reviews, professionals, and agencies
will be involved before construction can begin.

Important

Never assume a property can be developed the way you imagine.

Zoning information can change, regulations vary by jurisdiction,
and individual properties can have additional restrictions.
Natural Building Alliance provides educational resources and
practical guidance, but local authorities and qualified professionals
should be consulted for project-specific determinations.

Next Step

Understand the rules. Then design the building.

Once you understand the property’s constraints, you can make much
better decisions about design, materials, budget, and construction.


Continue to Design →